Servers That Use Little Power
Feb 4, 2008
I've been doing research, and looking around on Google for a list of processors that use little power.
What are some of the processors out now a days that have minimal power usage?
Chassis will be SuperMicro's with 1-4 GB ram, if that's of any use.
View 11 Replies
ADVERTISEMENT
Apr 9, 2008
We are taking out a quarter cabinet with 2.5amps from a colo company in the UK. I am just trying to figure out our expected usage figures for a few servers we are looking at putting in there. I'm not an electrician and i am struggling with all this amps, watts and volts stuff!
We are looking at running the following setup:
2 x PE2950 III with 1 Quad-Core Xeon E5410
8gb RAM
2 x146GB SAS (15.000 rpm) 3.5-inch Hard Drive 2 S 4 x 73GB SAS (15,000rpm) 3.5 inch Hard Drive 4 S in each server
2 x PE1950 III with 2 x Quad-Core Xeon CPUs X5450 3.0GHz/2x6MB 1333FSB 8GB 677MHz FBD (4x2GB dual rank DIMMs) 1 S 4 x 73GB SAS (10,000rpm) 2.5in Hard Drive in each server
if we will be able to run the above setup with 2.5amps?
View 1 Replies
View Related
Jul 31, 2007
I just bought the following server
Proliant ML570
4x 2.0GHz Xeon MP
I'm gonna add 3GB of PC1600 ECC RAM for a total of 4GB
I'd like to have the following hard drive config:
2x18 GB 15k RPM in RAID1 for OS (CentOS 5.0)
3x36+ GB 10k RPM in RAID5 for data
However that drive config may suck a lot of power.
The server has 3x600w PSUs, however, if I keep it under 6 drives, I can set up the PSUs in a 1+1 configuration so I would only HAVE to have 1 PSU connected.
View 14 Replies
View Related
Jul 27, 2009
do dual power supplies use more power than a single supply?
E.g. Say I have a server than uses two amps, powered by a single power supply. Now if I switch to a dual supply (and say each supply has the same efficiency rating as the single), does my server use more power? How much more?
My simple view of this is that it probably does, but maybe not much. The second power supply consumes some power itself, but since its not under load, it doesn't consume much. Therefore, my server with redundant supplies might use 2.1A or 2.2A.
View 14 Replies
View Related
Jan 20, 2007
I have a lot of questions here so if you can't answer them all I understand. even pointing me somewhere where I could get the answers would be appreciated; hardware sites focusing on server hardware, forums focusing on such, etc.
we plan to have three different types of servers:
- db server (self explanatory. mysql. for forums, mysql driven sites.)
- file server (lots of files around ~2-10MB, consistant 70mbps right now, but we want more room for upgrades. needs a LOT of storage room.)
- web server (lots of php files, but also static things like plain html, images, etc. also includes all misc services for the setup-- dns, etc.)
could I be given a rundown for which hardware each of the three should have? I don't need specifics, even just knowing that more ram is important here while cpu doesn't matter as much, or that the fastest disks available are a must, etc would all be valuable info for me. despite that, I certainly wouldn't mind specific hypothetical hardware configs.
for the database server I'm assuming the more ram the better. not entirely sure about the cpu? also not positive on disks...
for the fileserver, how much ram would be practical or useful? disk io will be an issue I'm because plenty of people will be pulling files at once so the disk needs to read from multiple places. scsi (and even raptors) are not an option as we need 750GB+ of space on a reasonable budget. more ram will take some load of of the disks, but how much is neccessary / reasonable?
for the web server I'm assuming cpu first, then ram, but it'll likely need less ram than the db server?
I'm more lost on the disks than anything. scsi on the fileserver is not an option under any circumstances due to $/GB. for the db & web server I'm willing to pay for scsi if the performance increase really does warrant the extra money, but I'd like to be convinced before shelling it out. if you have benchmarks geared at server hardware when it comes to disks I'd really appreciate it.
also, what's the best way to network these together when colocated? each one with a dual gigabit ethernet port and then the communications go to and from the router?
View 7 Replies
View Related
Dec 2, 2007
I just signed my agreement for 2 cabinets at Internap's Atlanta CoLo. For now, I will just have 1 120V 20A circuit in each cabinet.
At my office's server room we currently have 8 circuits I am powering my 2 racks from. I am just curious how many servers you can typically put on a 20A circuit. I am also considering adding two additional power feeds (1 more for each cabinet) to have truly redundant power for my dual power supplies.
I am hoping that 20A is plenty for my needs. I have around 20 HP and Dell systems. Mostly HP DL380s and Dell PE2950s.
Any ideas? I am splitting them in half, only filling up a half of each cabinet for now, as we are growing quickly and I wanted to overguy space so I would not be forced to add another cabinet later and have it end up somewhere else in the DC.
View 7 Replies
View Related
Sep 10, 2009
I wonder if any colocation providers here have any tips for measuring power. Currently I'm using APC 7900 power strips with amperage meter. I'm not a power expert by any means but I want to be able to calculate whats the cost having a server drawing 2 amps 24/7 365 days week.
Our secondary site gave us a whopping power bill, and at our own data center we never considered charging our customers for power.
View 14 Replies
View Related
Aug 10, 2009
I need to know what happens when a rack has capped its (lets say) 5A limit. I'm trying to calculate what exactly I can put into a rack and am considering that not all servers are going to be 100% load, as that would be bad performance anyway.
I guess it could do the following (but really don't know):
Cap performance of all servers
Cause system failures
Trip
The rack would have servers, a switch and perhaps a Remote Power Strip and Firewall. I don't know how they would be affected.
View 14 Replies
View Related
Apr 8, 2008
how much power the average hard drive would use? (ie a 1tb drive). I was looking on WDC's website and it said 7.5 watts peak durring writing and reading etc, so assuming thats at 110 voltage, would it be safe to assume that 12 drives @ 7.5 watts each would make a total of .81 amps? I am going off of the equation that Amps = Watts/Volts. So amps = 90/110
View 1 Replies
View Related
Jun 21, 2008
"Can i host a small forum at a 64mb ram vps with lighttpd and mysql? How many users can i have online?" I said that he can do that.Is this answer true?
View 14 Replies
View Related
Jan 13, 2008
We are transitioning from an on-site data center to a collocation facility and are having problems negotiating the right amount of power, the type of connections, and the PDU power strips that we need.
For simplicity lets say that we are going to rent a 10 ft by 10 ft cage area. This should house 4-5 rack cabinets.
The amount of power we are given for this area varies with the lowest being 120 watts/sq. ft and the highest being 175 watts/sq. ft.
With 120 watts per square foot that comes out to about 6.25 circuits that are 20 amps for a 10x10 space.
For the initial setup we would have a Cisco 73xx Router, a HP 26xx switch, an Avocent IP KVM, an EMC CX3-10 SAN, and our Dell PowerEdge 2950 III servers (4).
Using the calculator at: dell.com/calc I show the power requirements for all of the Dell equipment to be:
C13 Power Cord Qty: 12
Amperage on C13 Cords: 26.49 amps
System Heat/Power: 2754.6 watts
Total Current: 13.24 amps
The way I was envisioning this was Rack 1: Router, Switching, KVM on a 20 amp circuit and Rack 2: Dell Equipment on a 30 amp circuit. Is that right?
Additionally, I'm confused about single phase vs. three phase power in the data center and what most people choose to implement. I've heard talk of getting redundant power in each cabinet but that seems like you limit yourself to half of your space doing it that way.
And the last thing is it's confusing about what type of PDU you need to put in your racks to make it all come together. All of our equipment should be using IEC C13 cords and we're thinking about going with Avocent for all of the KVM/PDU so we can centrally manage it.
It seems to me that if the cost is roughly the same we should be pressing as hard as possible for the highest watts/square foot since that seems to be one of the most important commodities in any data center.
View 1 Replies
View Related
Feb 16, 2008
How much does a typical quad core Xeon eat, say an E5410 or a E7320? a 2GB RAM stick? A 500-750GB SATA disk? How much is the system overhead for a 1U unit? I tried to find data on this without too much success. For example Intel says the same number (80W) for an 1.6GHz CPU and a 2.4GHz one -- that does not sound too reliable to me.
If this is too abstract, then I would like to ask aobut the real world power consumption of two boxes. 1 E5410, 8GB of RAM, 2 SATA disk maybe 10K RPM. The other will have two E7320, 24-32GB of RAM and 3 10-15K disk.
View 5 Replies
View Related
Nov 26, 2008
I have been interested in setting up my own server for hosting a website and a small online game I created. My only problem is how good of a server I would need to get.
View 10 Replies
View Related
Jun 14, 2007
What the difference between high and low power on a PDU?
View 0 Replies
View Related
May 4, 2007
how to figure out how much power one would need?
My potential colo provider is saying that a 5A circuit comes standard with a 1/4 cabinet and that they charge $20 per amp over that. I will have (6) Dell 1650's with dual 650W PSU's. Any idea how to calculate how much actual power I will need for this configuration?
View 14 Replies
View Related
Mar 9, 2007
Im currently going through my tool box of parts and was thinking of building some cheap dedis for my customers. Unfortuantly the only hardware I can find is SocketA AMD 3200 (Barton Core) processors but Im unsure of the power they pull in amps.
The setup I would be looking to us is 512mb RAM, 80gb Hard Drive, Socket A 3200 XP processor.
View 8 Replies
View Related
Dec 13, 2007
What do you think the Standard Pricing for power should be in Toronto.
I heard $10 /amp how does that sound, Im just doing some research thanks for your comments.
View 3 Replies
View Related
Oct 29, 2007
I'm working out the power needs for running two Bc's ( each with 10 blades @ dual 2.8 with dual ide disks, 2x mgmt & 2x 4port Cisco sw ) and am quite frankly going in circles!
The rack will also host a 3550 swith, Vyatta fw ( dl360 ) and a TFT slide out job.
Now using the IBM calc i'm getting figures of around 20amps? Which sounds fair enough for 20servers, but is this correct and would have been better off with a mix of 1u's and 2u's?
Seems the cost saving on the blades will be outdone on the power consumption.. if so that's the last time i watch an IBM tv add!
View 14 Replies
View Related
Aug 26, 2007
I have just removed my servers and switch from a data centre in london only to find that for the last 6 months since I last visited the data centre some one has had one of there switches plugged into my power strip. When I approached the provider about this they claimed it would have not affected my charges for power consumption because they were monitoring the power of each server.
Is this possible for a provider to monitor the power for each single server on a power strip that I own? or are they just trying to get them selves out of trouble for the fact they have been over charging me for power for the last 6 months?
View 12 Replies
View Related
Apr 22, 2007
I maybe interested in co-locating a server but looking from the power max for a 1U server of around 0.3Amps I'm wondering if it will be easy.
Doing the equation 0.3 * 240 gives me 72watts I believe. (Where 240 is the voltage for the UK). So with this, it doesn't give me much choice considering most processors run around 90watts and that doesn't leave any room for the power from hard drives and memory. Does anyone know what the average power consumption is for hard drives and memory?
I'm not looking for a really power system, but I would like something that if I pull it out of co-location that I can still use it one way or another. So was looking at an AMD Athlon 64 X2 where there is a 34watt version that is seemingly discontinued. Or use an AMD Turion X2, which are again hard to find, with a mini-itx board. Running with the mini-itx board, there is also the Intel Core 2 Duo which I can get quite easily.
Does anyone else co-locate and how to you manage the specification?
View 10 Replies
View Related
May 29, 2007
at building 10 new servers to sell to our customers as dedis but are I am unsure of how power hungry the processors are.
The two options I am looking at are:
# E6600/E6400 Core2Duo Processor
# AMD X2 Energy Efficant 5000/4800/4600 Range
All the same setups are using just the one harddrive (SATA2 80gb) with 1GB RAM all on a budget motherboard. While I have seen Heavily used Core2Duo systems pull over 0.7amps (with 4gb ram and 2 hard drives) I am unsure which processor setup will use the less ampage. We are running these at 230v so had anyone got any ideas how much ampage these may pull and which would use the least ammount of power?
View 10 Replies
View Related
Jul 16, 2009
Recently Rackspace experienced an outage caused by their generators. I would not open this if its wasnt because in the last 10 years everytime there is a power outage on a DC the generators failed. (this is not a rackspace post, i just took 1 of 100 examples)
I dont want to mention names but I have seen plenty of DCs on which generators fail when the task is loaded to them. Some people said its because the maintaince is expensive and they dont do it on time.
Thats not always the case as I have seen DCs which made their maintainces on shape and time and they also had problems.
Now my question is if putting up generators costs so much money and we see them fail over and over again, are they up the task and worth the investment?
We know network only needs a short time without power and all is lost. This topic is ratter an approach on how to best handle power loads. Im sure there must be some way to actually be sure that when power FAILS, generators will keep up the task. The most sure testing would be to actually shift load to the generators every some months to test them but that would be plain Crazy on a production datacenter. I see that most outages have always the same guilty gear, generators...
Lets take another example, Gmail recently failed big time, because some Google DCs dont have chillers to keep the DC from getting hot (New Europe DC) for example. On hot days they shift the load to other DCs and turn the DC off. That of course failed too on a real scenario. Now Google is not a standard DC, but if they keep such a risky scenario in place they must have a sure way that power will keep up when the load is shifted and there is a big peak.
Will there be a better solution in the next 10 years for power or are we going to keep hoping generators dont fail exactly when we need them the most. Maybe we all should have UPS (plenty)on a rack to keep the power until the DC brings up generators, but thats useless if the network is affected as well and it always is.
View 14 Replies
View Related
Jul 23, 2009
I have a client which run an active CMS and the server is utilizing the swap space at the moment. It is running on 6GB memory and a Xeon processor now. Is there anything that I could do before going for hardware upgrade? The apache and mysql keep exhausting the memory during peak hours.
View 12 Replies
View Related
Aug 25, 2009
I recently bought a 2nd hand HP/Compaq ProLiant DL360 G3.
I've been checking some places to co-locate, rapidswitch & racksrv both look good but I'm still trying to figure out how much my peak power usage is during start up.
I've been googling to try and find out how, but I have had no luck.
So basically, my question is, How can I measure the peak power usage(in amps) during start up?
Sorry if this has already been asked(I did do a search but didn't find anything relevent).
the specs are:
Processor: 2 x Xeon 2.8GHz
Memory: 1.5GB RAM (looking to upgrade to 3GB)
Hard Drive: HP 36.4GB Ultra320 10K SCSI Hot Swap
View 14 Replies
View Related
Feb 28, 2009
I'm thinking about setting up a forum for my school, and I thought it would be better to go with a Vbulletin or IPB script for the forum. I don't really want to buy a lifetime license, so I looked at the IPB official hosting section and I have some questions.
Has anyone used them and know how good their hosting is?
View 10 Replies
View Related
Feb 23, 2008
My nearest major city is Manchester, so naturally I'm looking for rackspace in the region.
Unless anyone has better suggestions, I'm thinking of going with NorthernColo. They start at £50/month but jump to £70/month if you draw more than 1A of current.
If my basic physics is anything to go by, 0.5A at our 240V means a maximum server power rating of 120 watts.
...are there any dual-core / 2GB RAM box configurations which consume less than 300W thesedays? My own USB mouse for my laptop consumes 50mA.
Otherwise I'm begining to think of their 0.5A pricing as being a bit of a scam, since the 1A price also pays for 2U worth of space.
View 7 Replies
View Related
Feb 25, 2008
Is there any such thing as a fused power cord that would trip the offending device instead of everything on the UPS outlet? The only ones I can find are UK form factor.
View 0 Replies
View Related
May 29, 2008
The company I work for is starting to have some cooling issues in our server area. We have basically doubled our server equipment in the room without upgrading the air conditioning unit in the room. Temperatures are getting really high in the room (sometimes reaching 85F which is just WRONG!) and we are trying to get it replaced.
Since my boss is the one making decisions I thought I would try to help him out a little bit with some of the information/calculations he needs.
My questions are:
1. When calculating watts for a redundant power supply do you double what the power supply is rated for? So on one Dell PowerEdge 2950 it shows that I have a 750W redundant supply. Would that be 1500 Watts?
2. Do you calculate your cooling needs for max wattage or do you calculate a percentage of what each power supply is rated for?
3. What percentage would you multiply your final total Watts by to accommodate possible future additions? 10%? 25%?
We currently have:
2x PowerEdge 2950 - 750W Redundant
1x PowerEdge 1950 - 670W Redundant
2x PowerVault NX 1950 - 670W Redundant
1x PowerVault MD3000
3x APC Smart UPS 3000
1x APC Smart UPS 1400
2x PowerConnect 6224
2x PowerConnect RPS-600
3x PowerConnect 5324
1x Cisco 2801
1x Cisco 2821
3x Unknown wattage servers redundant power(All the same specs)
1x Unknown wattage server redundant power
1x Unknown wattage single power supply
Then a few other small devices like external modems, KVM and a small-mid sized phone system.
I am not an electrical expert but I am calculating that it is going to be about 10,000 - 12,000 Watts?
View 4 Replies
View Related
Feb 22, 2008
is there any way by which we can keep the command running on PUTTY even when there is Power Failure on our local computer.
What i mean is -
Suppose i am running a TAR command on my BOX and suddenly Power goes off my local PC, so when i relogin i have to start from starch,
is there any way to avoid it, and login back to putty and resume the session?
View 9 Replies
View Related
Aug 28, 2008
I've been wondering if datacenter owners would use good (real) power supplies, or cheap ones, in dedicated servers.
View 3 Replies
View Related
Nov 26, 2008
When mysql server is overloaded, Queries are already optimized, sql configuration is already optimized, already upgraded to good server (quad core, 8gb ram and what not) and yet still not enough (high server load).
What's the next step? Mysql clusters?
View 2 Replies
View Related